UK Monster Owners Club Forum » .: Technical :. » Mods & How To's » Slow Monster rebuild

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-01-2017, 04:47 PM   #11
350TSS
Too much time on my hands member
 
350TSS's Avatar
 
Join Date: Jan 2013
Location: Shipbourne
Bike: M900
Posts: 1,419
The strip down continued and the biggest issue for me was what to do first, I knew I wanted a two into one exhaust (to save weight) and I also wanted a parallelogram floating rear caliper hanger. I cannot weld very tidily as seen on the engine stand and thin stainless steel tube would be well beyond me so the exhaust would have to be done by competent others. The positioning of the anchor point for the reaction rod for the parallelogram rear brake could influence the exhaust position exiting on the RH side.
I also wanted a single seat and tidying up of the rear end.
350TSS is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:35 PM.

vBulletin Skins by vBmode.com. Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.