Register | FAQ | Members List | Calendar | Today's Posts | Search | Contact |
|
Registered
Members: 606 | Total Threads: 50,802 | Total Posts: 518,378 Currently Active Users: 309 (0 active members) Please welcome our newest member, andy10v |
|
|
Thread Tools | Rate Thread | Display Modes |
08-05-2012, 11:52 PM | #1 |
Registered User
Join Date: Mar 2012
Location: Bexley
Bike: S4
Posts: 121
|
Monster S4/999
Please be patient for pics (not taken any yet).
The 999s testastretta engine is in the frame. Things that are needed to do next are; Make and weld on out rigger bosses for the 999 black swing arm, to the frame. Move the shock rocker arm mounting position over on the frame to align with the swing arm shock mounting point. Remove the x-brace in the frame to fit the 999 airbox with 999R throttle bodies/shower injectors. Then re weld new bracing into position. Make adaptor lead for 999 inj to S4 loom. There will be many more problems no doubt but pics and updates soon. If anyone has a front 10 spoke Marchesini with the provision for the speedo drive spare, please let me know, as I am fitting a 999R rear wheel. Last edited by final_edition; 09-05-2012 at 01:29 AM.. |
|
|