UK Monster Owners Club Forum » .: Technical :. » Mods & How To's » Slow Monster rebuild

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 09-12-2020, 05:02 PM   #11
350TSS
Too much time on my hands member
 
350TSS's Avatar
 
Join Date: Jan 2013
Location: Shipbourne
Bike: M900
Posts: 1,420
One downside from today was that I ventured to sit on the bike whilst on the stand/ bike lift. This is the first time I have had the opportunity to sit on it since it got dismantled all those years ago.
It soon became very evident that the footrest hangers will have to be re-made to lower them (c 25mm) and move them rearwards (also by 25mm).
On the gear lever side I will have to spacer them out by about 10mm to clear the swinging arm and re-make a longer gear shift rod. On the brake side I have to be very careful of the alignment and distance between the pedal actuator and the rear brake master cylinder and the mounting point for the exhaust hanger and also probably lengthen the pipe between the master cylinder reservoir and the master cylinder.
350TSS is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 11:01 AM.

vBulletin Skins by vBmode.com. Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.