UK Monster Owners Club Forum » Gallery » UKMOC Bikes » Ben's 900 Monster build

Reply
 
Thread Tools Rate Thread Display Modes
Old 27-10-2022, 09:49 AM   #1
Albie
Fanactical volunteer
 
Albie's Avatar
 
Join Date: Oct 2003
Location: Kent
Bike: M900
Posts: 9,033
Drill and tap holes m6 in the same place. Take 2 black number plate screws the ones with the reduced front locatirs. These are the same size as the original lines.. Frome the back then screw the bolts through until the threaded portion stops the cut off the back with a chisel or sharp knife flat. You can glue but not necessary as plastic taps tight. Done a few now for customers of Proteam. Cost about 10p for bolts
Albie is offline   Reply With Quote
Old 17-02-2023, 11:26 AM   #2
900Rebuilder
Registered User
 
Join Date: Sep 2022
Location: Beeston
Bike: M900
Posts: 299
Quote:
Originally Posted by Albie View Post
Drill and tap holes m6 in the same place. Take 2 black number plate screws the ones with the reduced front locatirs. These are the same size as the original lines.. Frome the back then screw the bolts through until the threaded portion stops the cut off the back with a chisel or sharp knife flat. You can glue but not necessary as plastic taps tight. Done a few now for customers of Proteam. Cost about 10p for bolts
Thanks - only just spotted this top-tip
__________________
Ducati Monster 900 - Yamaha tdr125 & dt200wr - Ford GPW
900Rebuilder is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:48 AM.

vBulletin Skins by vBmode.com. Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.