Well it is not often I get done all I plan to do, but today was one of them. Splitting the hugger mould took a good 2 hours as did making the air scoop brackets. Gel coating the other side of the air scoops took an hour, most of that time was getting a wax seal between the pattern and the base and applying 5 coats of release agent.
The brackets fit to the washers I welded to the inside of the frame via a 5mm screw, the washers will have rubber grommets fitted and a nylon P clip will hold the wiring harness parallel to the frame tube so entirely hidden from view and no cable ties evident. The three smaller holes in the bracket are to enable the bracket to be bonded to the inside of the air scoop