View Single Post
Old 30-06-2022, 06:03 PM   #1
350TSS
Too much time on my hands member
 
350TSS's Avatar
 
Join Date: Jan 2013
Location: Shipbourne
Bike: M900
Posts: 1,419
750 engine re-commission

I was fortunate enough to bag the 750 engine Nasher was offering on here a while back.
Yesterday I collected it, enjoyed a good coffee and chinwag and admired Nasher's stable of bikes then brought it home.
I am not sure really why I bought it as I have 4 projects ongoing and 3 more waiting in the wings, these are
1. Slow Monster - bike has been transported to Benjy Straw's (electrical wizard and guru for Morinis) for him to see if he can find a spark,
2. 3 1/2 Moto Morini also at Benjy's for replacement of kick starter spring and set up of carbs,
3. ZX9R running on 3, 3.5 and sometimes 4 cylinders at low revs - a consequence of leaving ethanol petrol in the tank over the winter. I have had change the fuel pump and had the carbs off 5 times to put them through an ultrasonic cleaner - its 31 fasteners and 6 pipe clips to disconnect so a right pain,
4. replacing the crankshaft in a MZ TS125
This is what the 750 engine looked like
mouse sensor test online

this is my new keyboard

350TSS is offline   Reply With Quote