View Single Post
Old 29-11-2018, 06:07 PM   #817
350TSS
Too much time on my hands member
 
350TSS's Avatar
 
Join Date: Jan 2013
Location: Shipbourne
Bike: M900
Posts: 1,419
As a bit of light relief from rubbing down repaired moulds, I thought I would fit my heater pipe bungs to the float bowls and the blanking plugs for the electric heaters.
upload and share pictures
Whilst there I thought I would get rid of the “made of cheese” cross head screws on the carburettor float bowls and diaphragm top plus the choke retention clip. I used button head A2 stainless 5mm x 12mm screws which I then through drilled 2mm just because I did not want to go back into the resin fumed shed and it was comparatively warm in the garage today. This took about an hour then it was back to the rubbing down and second coat of gel coating the second half of the hugger, fly-screen and Ignitech enclosure moulds.
350TSS is offline   Reply With Quote