Agreed.
Get the engine right, then fit the swingarm and back wheel to it, drop the frame into place, get the fuel supply [Carbs/throttle bodies etc.] mounted, then fit the air box and main loom.
Then work outwards, finishing with the mudguards and lights.
Simples!
__________________
Original and Best since 1993
|