View Single Post
Old 03-01-2017, 02:09 AM   #51
350TSS
Too much time on my hands member
 
350TSS's Avatar
 
Join Date: Jan 2013
Location: Shipbourne
Bike: M900
Posts: 1,419
Continuing the lightening theme, I decided to make a CF instrument nacelle and headlight support bracket. The speedo and rev counter will fit into the wells formed in the mould with a rubber liner and with a clear ABS sheet fixed to the top surface. The headlight support bracket will fix by 2 x 6mm mush head cap screws to the top yoke where the indicator mounts are currently and will support the instrument nacelle and will be attached by the same 5mm mush head socket cap screws that fix the ABS sheet to the nacelle. at the lower fork yoke the two bolt holes used to secure the current headlight U bracket will attach to a cross piece between the two CF headlight supports. I have not yet decided whether to make a CF headlight shell, the attachment of the rim looks tricky to mould successfully.
image share
uploading images
350TSS is offline   Reply With Quote