View Single Post
Old 26-12-2020, 09:29 AM   #1304
350TSS
Too much time on my hands member
 
350TSS's Avatar
 
Join Date: Jan 2013
Location: Shipbourne
Bike: M900
Posts: 1,419
Next jobs are:
Fit the right hand side footrest hanger, possible issue with length of pipe from the rear brake master cylinder to reservoir pot
Fit the larger fairing side decals to the tank and lacquer over
Fit the tank to the bike (involves making a front latch/bungee arrangement)
Connect up rear lights and camera and see if I can get the camera to talk to the monitor
Re-design the top mount for the flyscreen to make it more durable and easier to dismount (awaiting delivery of rubber isolation mounts)
Finally mount the instruments and the lens covering them, fit the voltmeter
Fit rear number plate and reflector - I have a plate already fitted for MOT purposes but have ordered a smaller 7 x 5 plate which will look loads better
See if I can get a spark at the spark plug from the Ignitech ignition system
Get the bike off the hydraulic bike stand and weigh it
Put petrol in and take for a test ride / MOT
PIECE OF CAKE???

Last edited by 350TSS; 26-12-2020 at 09:43 AM..
350TSS is offline   Reply With Quote